It’s easy to start & hard to finish

Work at the Electron Workshop continues. And continues. Today the bulk of the work for our staircase into the mezzanine / recording studio area was completed… Using F17 LVL load bearing beams as our material of choice (the same type of beam we use to spam the mezzanine), we’ve attempted to maintain a style consistency […]

Slightly chaotic, but we’re in…

A long and productive day at the Electron Workshop

A long and productive day at the Electron Workshop – LVL Structural beams in place for the mezzanine / podcasting studio, and finally the enormous hole we jack hammered in the floor to level off for the floor was laid as a concrete slab. So far, all the work at the Workshop has been done […]

Progress at the Electron Workshop…

Progress at the Electron Workshop… Cutting out the slab in order to jack hammer – We’ll then apply a leveling compound. As the warehouse was originally an auto garage, the floor has both a work pit, and drainage areas – As an office, these features are not particularly useful… So level we must!  

Photos by Aaron Tester

Photos by Aaron Tester  

Sandblasting… A messy job.

Sandblasting… A messy job.

Sandblasting

Sandblasting with Dean from National Sandblasting    

4000 PSI

We started out stripping the walls with a petrol powered 4000psi pressure washer – Slow, and wet. We switched to sandblasting…    

Day One

The Electron Workshop from day one – The ‘blank’ canvas we started with.    

Just received the keys!

Just received the keys!