A long and productive day at the Electron Workshop
A long and productive day at the Electron Workshop – LVL Structural beams in place for the mezzanine / podcasting studio, and finally the enormous hole we jack hammered in the floor to level off for the floor was laid as a concrete slab. So far, all the work at the Workshop has been done […]
Recent Comments