A long and productive day at the Electron Workshop – LVL Structural beams in place for the mezzanine / podcasting studio, and finally the enormous hole we jack hammered in the floor to level off for the floor was laid as a concrete slab.

So far, all the work at the Workshop has been done by just the two founders (except for the sandblasting)! Not bad for a couple of programmers.